New countertops are one of the most satisfying upgrades in a home — and the process is simpler than most people expect. Here's exactly what happens from your first call to the final walk-through, and how to get your kitchen ready.
1. Consultation
We start by learning how you use the space: how much you cook, who's in the kitchen, the look you're after and your budget. Bring photos, a cabinet door sample or a paint chip if you have them. You can visit our shop in Danvers or start over the phone.
2. Choosing your slab
This is the fun part. You'll see full slabs in person and choose the exact piece that becomes your countertop. Looking at the whole slab — not just a small sample — lets you see how the veining moves and where the most striking areas are, so we can plan to put them where you'll see them every day.
3. Templating
Once your cabinets are installed and level, we come to your home to measure with digital templating. This captures every wall, corner and overhang precisely, and it's when final details are confirmed: sink and faucet locations, cooktop cut-outs, edge profile, overhangs and seam placement.
Have these on site for templating: your sink (or its exact model/spec sheet), faucet, cooktop or range specs, and anything else that will be cut into the stone.
4. Fabrication
Back at our shop, the slab is cut, shaped and finished. Edges are profiled, cut-outs are made for sinks and faucets, and everything is polished. Because fabrication and installation are handled by the same team, the plan agreed at templating is the plan that arrives on install day.
5. Installation
Our crew sets the stone level and secure, joins seams, mounts undermount sinks where needed, and cleans up before leaving. Most kitchen installs are finished in a day or two. Plumbing hook-up of faucets and disposals is typically completed by your plumber after the stone is in place.
6. Final walk-through
We review the finished work with you and go over simple care guidance for your specific stone. (For more, see our guide to caring for natural stone.)
Prep checklist for install day
- Clear countertops and empty the upper cabinet shelves closest to the counters.
- Make sure there's a clear path from the door to the kitchen — slabs are large and heavy.
- Disconnect plumbing and the cooktop beforehand, or plan for your plumber/electrician to do it.
- Remove existing countertops if that isn't part of your quote (ask us if it is).
- Keep pets and kids out of the work area during install.
Common questions
Can I see where the seams will go? Yes. Seam placement is planned in advance and reviewed with you, so seams land where they're least visible.
Do you work with designers and contractors? Absolutely — we're the stone partner for builders, remodelers and design studios across New England, and we coordinate scheduling directly with your team.
Frequently asked questions
How long does countertop installation take?
Most kitchen installations are completed in a day or two once fabrication is finished.
Do my cabinets need to be installed before templating?
Yes. Cabinets must be installed and level before digital templating so the measurements are exact.
Do I need my sink on site for templating?
Have the sink, or its exact model and spec sheet, available so the cut-out can be made precisely.



